יום ראשון, 19 בינואר 2014
יום חמישי, 16 בינואר 2014
יום ראשון, 12 בינואר 2014
Long time no update- busy bees
We havn't Updated for some time now due to messing with rigging- something you cant really capture in pics. However- we came back a bit to some stuff we can show.
So right now we have our machine at about 90% Rig, meaning it can actually play and move (Halluljah) and additionally we are at about..60-70% on the musician rig. many small procedures to do and polish, but at
least hes not in a vegetative state.
So on the list before moving to prvz (Pre-vizualiztion-camera directing etc.) we have a bit of work: Finish , Rigs, Textures and then Modeling, Rigging and texturing the enviorments and locations.
So- some textures for you people: all are WIPs but still, starting to look cool.
So right now we have our machine at about 90% Rig, meaning it can actually play and move (Halluljah) and additionally we are at about..60-70% on the musician rig. many small procedures to do and polish, but at
least hes not in a vegetative state.
So on the list before moving to prvz (Pre-vizualiztion-camera directing etc.) we have a bit of work: Finish , Rigs, Textures and then Modeling, Rigging and texturing the enviorments and locations.
So- some textures for you people: all are WIPs but still, starting to look cool.
הירשם ל-
רשומות (Atom)